Fire System Design, Installation, Testing & Commissioning - Turn Key

Seconds are crucial in case of the fire, A poorly designed and installed system may increase your response time and ultimately it will result in the loss of life or damage to property.
Place right type of fire protection system at the right place

Fire Extinguishers

Either it is the local requirement of IS - 2190 (2010) & NBC or It is the International compliance of NFPA 10, Our engineers are expert in planning & placement of right type of extinguishers at right distance.

Fire Sprinklers

Either it is the local requirement of IS - 15105 (2012) & NBC or It is the International compliance of NFPA 13, Our engineers are expert in planning and designing and installation of the sprinkler system.

Fire Hydrant

Either it is the local requirement of IS 3844, OISD-STD-117 & NBC or It is the International compliance of NFPA 24, Our engineers are expert in designing and installation of hydrant system.

Detection & Alarm

Either it is the local requirement of IS 2189, IS 15908 (2011) & NBC or It is the International compliance of NFPA 72, Our engineers can provide all service from designing to installation at your site.

Fire Risk Assessment

Fire risk assessment is an organized check of what, in your work activities and workplace, could cause harm to people from fire. It will help determine the likelihood of a fire occurring and the dangers from fire that the workplace poses for the people who use it.

NFPA 551 Guide for the Evaluation of Fire Risk Assessments.

ISO 16732-1:2012(en)  Fire safety engineering — Fire risk assessment — Part 1: General

Fire System Feasibility Study

Are you planning for a new Fire Protection or Prevention system installation?

Read this, as it covers important aspects to make the most efficient and effective fire system. This information is essential for understanding the requirements, possibilities, and implementation details.

We make a brief study on the basis of

  • Economical Feasibility
  • Technical Feasibility
  • Duration Feasibility
  • Operational Feasibility

by the professional to decide whether a project is feasible or not.

Our engineers also conduct site surveys and prepare Bills of Quantities for fire protection projects based on your site requirements, fire load calculations, and feasibility analysis.

Fire Load Calculation

Fire loads are calculated based on the conversion of mass into energy units (MJ) using the calorific value (heat release) of the corresponding material. To simplify fire load estimations, calculations are often done using the following assumptions:

Combustible materials are uniformly distributed throughout the building/facility

All combustible materials (with the exception of combustibles stored in suitable enclosures) within the fire compartment would undergo total combustion

The actual assessment of severity in any specific facility fire situation is essentially a subjective matter and to a particular extent, depends upon the physical and thermal properties of the enclosing structure itself and therefore the degree of ventilation involved.

Thus, temperature and the duration of burning in a compartment depend upon whether the walls and ceiling are good conductors or insulators and how much thermal energy is exhausted outside the burning room.

Annual Maintenance Contract

Fire Extinguishers

Either it is the local requirement of IS - 2190 (2010) & NBC or It is the International compliance of NFPA 10, Our engineers are expert in planning & placement of right type of extinguishers at right distance.

Fire Sprinklers

Either it is the local requirement of IS - 15105 (2012) & NBC or It is the International compliance of NFPA 13, Our engineers are expert in planning and designing and installation of the sprinkler system.

Fire Hydrant

Either it is the local requirement of IS 3844, OISD-STD-117 & NBC or It is the International compliance of NFPA 24, Our engineers are expert in designing and installation of hydrant system.

Detection & Alarm

Either it is the local requirement of IS 2189, IS 15908 (2011) & NBC or It is the International compliance of NFPA 72, Our engineers can provide all service from designing to installation at your site.
Himaya Prevention - Fire Safety